© copyright Valley Iron
     



Goliath




Riddler's Revenge




Batman




Hurricane Harbor




Superman




Vanguard Plastics




Psyclone
 

Goliath, Giovanola/ Six Flags Magic Mountain- Valencia, California
Scope: Labor to erect.
Date: 7/99 to Present

California Screamin, Intamin/ WDI- Disney's California Adventure
Scope: Fabricate and assemble structure.
Date: 6/98 through 11/99

Inverted Coasters, Fabriweld/ Vekoma- Georgia, Belgium, South America
Scope: Fabricate 3 inverted coaster tracks and switches.
Date: 1/98 through 7/98

Rocket Bike Test Track, Fabriweld/ WDI- Disney Golden Oak Ranch
Scope: Fabricate and assemble structure.
Date: 9/97 through 1/98

Riddlers Revenge, Six Flags Magic Mountain- Valencia, California
Scope: Install B&M standup coaster.
Date: 9/97 through 3/98

Pterandon Flyer, Fabriweld- Universal Florida
Scope: Fabricate coaster track.
Date: 9/97 through 11/97

Batman the Ride, Six Flags over Georgia- Atlanta, Georgia B&M Inverted Coaster
Scope: Install track.
Date: 10/96 through 9/97

Universal Partners, Simi Valley California- Clearfield Utah
Scope: Move test track.
Date: 6/97 through 7/97

Hurricane Harbor, Six Flags Magic Mountain Valencia California
Scope: Provide and install steel structures for 3 slide complexes; install glass.
Date: 3/97 through 5/97

Countdown to Extinction, Fabriweld- Disney's Animal Kingdom Orlando, Florida
Scope: Install track.
Date: 7/96 through 9/96

Superman, Intamin- Six Flags Magic Mountain Valencia, CA
Scope: Fabricate and erect 415 foot tall freefall coaster and launch.
Date: 10/95 through 5/96

2 Indoor Coasters- Premier Rides
Scope: Fabricate support structures for 2 paramount parks.
Date: 7/95 through 12/95

Indiana Jones, Fabriweld- Disney Anaheim, California
Scope: Install floor track; install maintenance track.
Date: 94 and 8/95

Hurricane Harbor, Six Flags Magic Mountain, Valencia California
Scope: Furnish and install structural steel; erect fiberglass. 4 water slides.
Date: 12/94 through 6/95

Vanguard Plastics Plant Expansion, Rancho Cucamonga California
Scope: Design/ build equipment support system.
Date: 1/95 through 5/95

Walter Rueff Auto Center, Pre-Engineered Steel Building- San Fernando California
Scope: Design/ build auto repair center; perform earthquake retrofit.
Date: 9/94

Water Slide, Canobie Lake- Salem, New Hampshire
Scope: Furnish and install Whitewater West slide and structure.
Date: 5/94

Batman the Ride, Inverted Coaster- Six Flags Magic Mountain
Scope: Erect bolinger and mabilard ride; furnish and install support buildings.
Date: 3/94

Sierra Slide, Water Slide- Six Flags Magic Mountain
Scope: Labor to erect.
Date: 3/93

Batman the Escape, Standup Coaster- Six Flags Astroworld
Scope: Labor to erect.
Date: 2/93

Gadgets Go-Coaster, Children's Ride- Mickey's Toon Town Disneyland
Scope: Labor to erect.
Date: 9/92

Batman Stunt Show, Entrance, Stage and Shade Structure- Six Flags Magic Mountain
Scope: Construct concrete stage, gothic entrance and shade structure.
Date: 6/92

Flashback, Sit Down Coaster- Six Flags Georgia
Scope: Relocate ride from Georgia to California.
Date: 4/92

Viper, Mega Coaster- Arrow Dynamics
Scope: Install ride updates.
Date: 7/91

Psyclone, Wood Coaster- Six Flags Magic Mountain
Scope: Form and pour foundations.
Date: 11/90

Viper, Mega Coaster- Six Flags Magic Mountain
Scope: Labor to erect.
Date: 3/90

Sears Roebuck and Co., Retail Store- Antelope Valley Mall
Scope: Furnish and install fabricated steel.
Date: 6/90

Tidal Wave, Water Ride- Six Flags Magic Mountain
Scope: Labor to erect.
Date: 5/88

Ninja, Suspended Coaster- Six Flags Magic Mountain
Scope: Complete project started by others.
Date: 5/87

Shockwave, Stand-up Coaster- Six Flags Magic Mountain
Scope: Labor to erect.
Date: 5/85

________________________________________________
company profile
l services l projects l contact us l home

E-mail: [email protected] - � Copyright 2001 - Valley Iron Fabricators-Erectors Inc. - All Rights Reserved.
Site designed by Hotdott